Re-launch of the REOI for the ESMP audit in the CLSG

LB_REOI-Audit of the ESMP – CLSG_Project – 16.03.23  (Liberia)

GN _AMI-Audit of the ESMP – CLSG_Project – 16.03.23 (Guinea)

CDI _AMI-Audit of the ESMP – CLSG_Project – 16.03.23 (Cote d’Ivoire)

SL_REOI-Audit of the ESMP – CLSG_Project – 16.03.23 (Sierra Leone)

Check Also

Botota Substation has been constructed and energized by TRANSCO CLSG

All five substations in Liberia have been fully constructed and energized by TRANSCO CLSG. The …